Highlights

Highlights

  • Proven Production History: Mined and processed ~7.7 Moz silver, 123 Mlbs zinc, and 85 Mlbs lead between 2012 and 2018 under Buenaventura’s operation.
  • Fully-Permitted Mill Infrastructure: Includes a 600 tpd flotation plant, assay lab, core shed, tailings storage, and camp infrastructure.
  • Restart-Ready Asset: Infrastructure remains in place and well maintained, enabling near-term reactivation potential.
  • High-Grade Epithermal Vein System: Historically exploited narrow, high-grade silver-lead-zinc veins in a structurally controlled setting.
  • Regional Synergy: Proximal to Excellon’s Tres Cerros exploration project, providing shared infrastructure and development upside.

Email Signup

Sign up for the latest news and updates

Email Signup

Sign up for the latest news and updates